Gladstone Harbour
RG Tanner Wharf scaffold installation
Walz Group | 2021 November
A 7 ton Scaffolding system that was built onshore was lifted onto the dumb barge and our vessel masters skillfully placed the tug and barge combination under the ship loader for final lift into position to support shutdown works.
Vessels Alkira and Shackleton along with a 36m Dumb Barge proved to be perfect for the job and completed the works flawlessly.